|
14.) Now take (2) of the 3/4" Gray
Electrical PVC Conduit and make your interior LIGHT RING. Take
your extra (4) Double Tees from step 11 and attach the light
ring to the 45" horizontal supports. |
|
15.) Now it is time to make your
24" VERTICAL SUPPORTS. Same as above, Glue a snap on tee onto
ONE END ONLY, lay them on a flat surface, attach the other tee,
mark it and THEN glue the other snap on tee in place.
|
|
16.) Snap your 24" VERTICAL
SUPPORTS onto the bottom octagon using the unused spots from the
horizontal supports. Then attach your TOP octagon. |
|
17.)
STOP! BEFORE YOU GO ANY FURTHER. THE
PICTURES DON'T SHOW THE SECOND TRUNK RING INSTALLED YET. ATTACH
YOUR DOUBLE TEES TO IT AND SLIDE IT OVER THE VERTICAL SUPPORTS
NOW. OTHERWISE YOU WILL HAVE TO TAKE IT ALL APART TO INSTALL IT
LATER. IT GOES UNDER THE TOP
RING.
CLICK HERE TO SEE HOW IT ATTACHES. |
|
18.) Here is an overhead shot of
how your vertical supports should line up. |
|
19.) Now begin attaching (4) more
of your 24" vertical supports at the outer edge. |